Career Objective
Permanent Address
Phone: 02-6921283Cellular Phone: 01-8222299
Fax: -Current Address
e-mail: phuping@ksc.th.com
Phone: 02-6921283Cellular Phone: 018222299
Fax: -Current Experience
e-mail: phuping@ksc.th.com
------------------ Job title: Environmental Engineer Company: Seatec International Ltd./Thorani Tech Co. Ltd., Bangkok, Thailand. NumYrs: 2 Previous Experience -------------------Title, Employer:, NumYrs
Education
Attached Cover Letter and/or Resume
Project concerns review detail design of wastewater treatment plant of condominium. Recommendations for apply suitable technology in biological treatment. Responsible for review the treatment plant design and recommend possibility of system.9.1.2 EIA for Lassale Park Condominium Project, Bangkok. 1996.
Project concerns construction of condominium. Study existing environment and assesses impacts of constructive and implement activities. Recommendations for mitigate impacts of the project and monitoring programs for environmental management. Task included research and collection of baseline data and field research. Responsible for the following aspects of the EIA study: project description, wastewater, water quality and human use values in water use.9.1.3 EIA for Tunnel Construction Project, Loei. 1995-1996.
Project concerns tunnel construction for mini hydro power plant on Namman and Namsan River at Loei province. The project involved study and survey construction area of weir, desander, headrace, surge tank, tunnel, and power house. Study existing environment and assesses impacts of constructive and implement activities. Recommendations for mitigate impacts of the project and monitoring programs for environmental management. Task included research and collection of baseline data and field research. Responsible for the following aspects of the EIA study: project description, surface and groundwater quality evaluation and monitoring program.9.1.4 EIA for Siam Iron Expansion Plant Project, Rayong. 1995-1996.
Project concerns development of production line efficiency to increase production rate. The project involved review original environmental protection program and field survey sensitive areas that will receive impacts from production processes, survey the existing environment around the study area. Reviewing the environmental impact mitigation and monitoring of old plant. Assessing impacts of constructive and Implement activities Recommendations for suitable mitigate impacts of the project and monitoring programs. Task included : Research and collection of baseline data and field research. Responsible for the following aspects of the EIA study: project description, risk assessment, solid and hazardous waste impact evaluation and monitoring program.9.1.5 EIA for PC Wire Production Plant Project, Rayong. 1995.-1996
Project concerns construction of wire strand and steel wire for prestressed concrete production plant. The project involved field survey construction area of new plant, survey the existing environment around the study area. Reviewing the environmental impact mitigation and monitoring of old plant. Assessing impacts of constructive and Implement activities Recommendations for mitigate impacts of the project and monitoring programs Task included : Research and collection of baseline data and field research. Responsible for the following aspects of the EIA study: project description, and wastewater impact assessment.
9.2 FROM : June 1995 To : October 1995
EMPLOYER : Clean Technology Co. Ltd., Bangkok, Thailand.
POSITION : Environmental Engineer
DUTIES :
9.2.1 Feasibility Study of Wastewater Collection and Treatment Plant for Municipal Hospital, Thailand. Responsible for wastewater collection and treatment plant design, field investigation for plant location. This typical design is applied to more than 300 municipal hospitals in Thailand.
9.2.2 Wastewater Treatment Plant of Lever Brother Co.,Ltd. : Responsible for design of wastewater treatment process used in the production plant.